About EVOL LNG
Our LNG production and distribution capabilities include:
- 250 tonnes per day LNG plant in Kwinana, Western Australia;
- Supply from APA Group’s LNG facility in Dandenong, Victoria;
- Australia’s largest fleet of LNG road tankers; and
- LNG storage & vaporisation facilities for power generation & industrial applications.
We have a wealth of in-house engineering expertise covering all aspects of LNG production, storage, transport and vaporisation, as well as skilled technicians who maintain our LNG assets.
Who we are
Josh Phillips
Manager LNG
Josh has been with EVOL LNG for over a decade, and has successfully contracted more than 80,000 tonnes per annum of LNG sales to power generation customers in this time; achieving the company’s growth objectives. Josh is equipped with a useful understanding of mineral processing, gas and dual fuel engine technologies, and energy economics. His focus is on creating customer value, managing risk and delivering high quality solutions. Josh was instrumental in the marketing of LNG to the marine sector, establishing EVOL LNG’s bunkering capabilities in WA, and performing the first truck-to-ship LNG bunkering operations in Australia.
Josh is also a highly competitive sportfisherman, with a passion for marine ecology.
Hilton Ward
Project Development Manager
Hilton has been working alongside EVOL LNG for the past nine years, starting in a technical role coordinating the maintenance of LNG facilities and equipment, later joining the EVOL LNG team as a project specialist. In his current position, Hilton adds customer value by managing projects from the design stage through to energy supply, utilising his knowledge of LNG systems to produce efficient solutions and results.
Hilton has a qualified background in Electrical and Instrumentation within the resource and energy sectors.
Tom Dallison
LNG Project Coordinator
Tom joined the EVOL LNG team in March 2021 as Project Coordinator. Tom’s primary role is coordinating the procurement and construction of our LNG facilities on remote power generation sites. Tom has been in the Kleenheat business since 2015 and prior to starting with EVOL LNG, he was Kleenheat’s Team Leader in the Operations Maintenance team and was responsible for the installation and maintenance of the various LNG and LPG assets (fixed and mobile) throughout Western Australia.